In 2008, SYSTRA was appointed project manager for the design and supervision of construction work on the extension of Line 2 of the Sofia metro. This line runs from the north west of Sophia (Obelya) to the south (Cherni Vrah).

SYSTRA was responsible for:

  • Project management
  • Assessing and managing project risks
  • Respecting the construction schedule
  • Budget supervision
  • Approving technical documents and shop drawings
  • Coordinating, inspecting and verifying technical requirements
  • Equipment and systems acceptance and testing
  • Line testing and commissioning